Question

    Match List 1 with List II

    List I

    List II

    A. Parallel system

    I. Junction box

    B. Grouping system

    II. Bedding system

    C. Special drains

    III. Mixed system

    D. Surface drains

    IV. Grid system

      Choose the correct answer from the options given below

    A A-IV; B-III; C-I; D-II Correct Answer Incorrect Answer
    B A-III; B-II; C-I; D-IV Correct Answer Incorrect Answer
    C A-I; B-II; C-III; D-IV Correct Answer Incorrect Answer
    D A-IV; B-II; C-III; D-I Correct Answer Incorrect Answer

    Solution

    They are the sub surface drainage systems. Parallel system is Grid system, Grouping is a mixed system, Junction box are special drains and bedding system is followed in surface drainage system