Statement A: Sand and silt materials transported by wind are indeed called loess and aeolian. Loess refers to a windblown deposit of fine-grained sediment, predominantly consisting of silt-sized particles. Aeolian refers to the processes or features associated with the action of wind. Statement B: Materials transported and deposited by water are referred to as alluvium, while materials transported and deposited by gravity are referred to as colluviums. Statement C: The laterization process does favor the formation of 1:1 type of clay minerals of the kaolinitic group. Laterization is a weathering process that occurs in tropical and subtropical regions, where intense leaching and oxidation cause the removal of silica and the enrichment of iron and aluminum. This process leads to the formation of clay minerals, particularly of the kaolinitic group, which are characterized by a 1:1 layer structure.
The speeds of Vishank and Karun are 60 km/hr and 90 km/hr. Initially, Karun is at a point P and Vishank is at a place Q. The distance between P and Q i...
‘A’ and ‘B’ can do a piece of work in 22 days and 25 days, respectively. If they started the work together and worked on it for 6 days, then fin...
40 men take 15 days to finish some work. If the work is to be finished in 8 days, then how many additional men should be hired?
Anil and Ashish receive Rs.1500 for work of 5 days. If Anil is 4 times efficient than Ashish, then find the daily wage received by Ashish.
Amit and BK working together can finish a particular task in 90 days, while BK and Chiku working together can complete the same task in 70 days. Determi...
Suraj is one third as good as workman as Pankaj and together they finish a piece of work in 36 days. The number of days taken by Suraj alone to finish t...
A takes 32 days to complete a work while B can complete the same work in 12 days less than A. If C can complete 25% of the work in 12 days, then find th...
Two pipes A and B can fill a tank in 24 min., and 32 min, respectively. If both the pipes are opened simultaneously, after how much time B should be clo...
A painter charges ₹500 for every hour of work. If he works for 6 hours a day and completes a project in 5 days, what is the total amount charged by th...
A, B and C can complete a work in 10, 20 and 15 days respectively. A left the work 3 days before the work was completed and B left 1 days after A had le...