Question
GSTN is
a?Solution
GSTN is a pvt. Ltd. company formed u/s 8 of Companies Act i.e. to promote non-profit objectives.
- A train moving at a speed of 50 m/s crosses a pole in 12 seconds. Determine the time required for the train to pass a 800-metre-long platform.
A train can cross a pole in 32 seconds. While if the train increased its speed by 45% then time taken by it to cross 289 metres long platform is 42 seco...
A Train Rajdhani Express leaves Kanpur station at 6 am and reaches Lucknow station at 10 am. Another Train Shatabdi Express leaves Lucknow station at 8 ...
There are two trains A and B. A start from point X at 6 AM towards point Y. Another train B starts at 7 AM from point X. If they meet at 12 PM an...
Train P travelling at 66 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 42 km/hr in 28 seconds...
Two trains start at the same time from Patna and Delhi and proceed toward each other at the speed of 120 km/hr and 60 km/hr respectively. When they meet...
A train 240 m long passes a pole in 24 seconds. How long will it take to pass a platform 650 m long?
Two trains of length 420 metres and 320 metres are moving in opposite directions with speeds 15 m/s and 20 m/s. If initially they are 100 metres apart, ...
Train ‘A’ running with a speed of 108 km/hr crosses a vertical pole in 10 seconds. Find the approx. time taken by the train ‘A’ ...
Train βAβ can cross a pole in 10 seconds and a 50 metre long platform in 12 seconds. If the ratio of length of train βAβ and train βBβ is 2:...