In the O&M model, the private player is responsible for operating and maintaining the project while ownership remains with the government. This model is commonly used for toll roads where the private player collects toll revenue.
(35.09 × 4.98 + 512.12 ÷ 31.82) =?
49.99% of 5400 + 923=?
194.95 + 3.98 × 64.99 - ? = (10.99 + 9.02)2
(29.892 × √290) + 32.98 × 6.91 = ?
`sqrt(7.987 X 24.790 +199.991)`
[(80.97) 3/2 + 124.95 of 8% - {(21.02/6.95) × 10.9 × 5.93}]/ 45.08 = ?
26.23 × 31.82 + 44.8% of 1200 + ? = 1520
(29.98% of 9840) + ? + (19.899% of 8490) = 7560
? + 154.99 – 110.01 = 30.01 × 4.98
(64.99% of 599.91 + 49.99% of 199.99 + 135.11) = ?2