Question
A bank has failed to meet its obligation on account of a
payment on due date due to its incapacity to pay. What kind of risk it is?Solution
Settlement risk is the possibility that one or more parties will fail to deliver on the terms of a contract at the agreed-upon time. Settlement risk is a type of counterparty risk associated with default risk, as well as with timing differences between parties.
A boat is being rowed away from a cliff 183 m high. From the top of the cliff, the angle of depression of the boat changes from 60° to 45° in 3 minute...
If distance between two pillars of length 16 & 9 cm is x cm. If two angle of elevation of their respective top from a point on ground of other are c...
The distance between two parallel poles is 65√3 m. The angle of depression of the top of the second pole when seen from the top of first pole is 3...
From a watch tower of 150 m height, the angles of depression of two cliffs in a horizontal line through the base of the tower are 45° and 30°. Find th...
The angle of elevation of an aeroplane from a point on the ground is 60°. After 12 seconds flight the elevation changes to 30°, if the aeroplane...
From a watch tower of 205 m height, the angles of depression of two cliffs in a horizontal line through the base of the tower are 45° and 30°. Find th...
From the top of an upright pole 30√3 feet high, the angle of elevation to the top of an upright tower was 60°. If the foot of the pole was 55 feet aw...
A vertical tower stands on a horizontal plane and is surmounted by a vertical flag staff of height h. At a point on the plane, the angle of elevation of...
There are two houses of the same height on both sides of a 30-meter wide road. From a point on the road, elevation angles of the houses are 30° and ...
At a point 20 metres away from the base of a 20√3, metres high house, the angle of elevation of the top isÂ