Start learning 50% faster. Sign in now
Union Minister of State for Railways Darshana Jardosh, has shared the first glimpse of Surat’s Bullet Train station. She has shared the graphical illustration of the railway station to be constructed between the Mumbai- Ahmedabad route. The construction of bullet train station in Surat is scheduled to be completed by December 2024. The bullet train station in Surat will be the first in India to be built between Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR). The MAHSR corridor will have 12 stations namely Surat, Vadodara, Anand, Ahmedabad, Sabarmati, Bilimora, Bharuch, Mumbai, Thane, Virar, Boisar, Vapi stations. The Ahmedabad-Mumbai high-speed train project will reduce the travel time between Mumbai in Maharashtra and Ahmedabad in Gujarat to 2.07 hours with limited stops and 2.58 hours with stopping at every station.
What will be the Land equivalent ration when sole crop yield is 50 & 40 q/ha and intercrop yield is 20 q/ha and 10 q/ha in intercropping system?
Which among the following state has lowest labour wages per day
What is the annual rainfall of the Humid area in mm?
Which one of the following statements is incorrect in case of surface retention of crop residues (mulching)?
The medium range weather forecasting is valid for
Instrument used for measuring solar radiation is ____
The black cotton soils of India are
A weed with short-lived blue coloured flowers is
Number of poultry batches can be reared in a year?
The silkworm spin cocoon after: