To bridge the wide funding gap for the creation of urban infrastructure, the Centre will allocate ______ annually from the corpus of the priority sector lending shortfall of banks to accelerate urban capital expenditure.
To bridge the wide funding gap for the creation of urban infrastructure, the Centre will allocate Rs 10,000 crore annually from the corpus of the priority sector lending shortfall of banks to accelerate urban capital expenditure. The idea is to create a long-term dedicated fund flow mechanism for the sector. The funds would be used by public agencies to build urban infrastructure in Tier 2 and Tier 3 cities (state capitals and smaller towns). In the Budget for 2023-24, Urban Infrastructure Development Fund (UIDF) under the National Housing Bank will be established through the use of priority sector lending shortfall, like the Rural Infrastructure Development Fund (RIDF) under the National Bank for Agriculture and Rural Development (Nabard).
The exotic breed of cattle that produces maximum quantity of milk is (5000-6000 litre/ year)?
A system in which forest trees are grown along with agricultural crops and grasses on the same land at the same time is known as ____
Which of the following State/ UT has been declared as 'Free Area' for purposes of Prevention and Control of Infectious and Contagious Diseases in Animal...
FIRB method of planting is followed in which crop?
Pusa Meghna, Pusa Shubhra and Pusa Snowball are the varieties of which vegetable crop?
Parboiling of paddy is done in order to ____
The optimum temperature for the germination of wheat seed is ____.
A method of asexual propagation in which a stem is made to produce roots while still attached to the parent plant is called
International centre for Agricultural Research in Dry Areas (ICARDA) is located at
...The type of germination observed in pigeon pea?