The eMobility Simulation Lab will have the latest tools along with financial support from Altair & will carry out other e-mobility labs for batteries, charging, power electronics, motors and controllers, and vehicle engineering.Which institute has partnered for the e-mobility lab?
Indian Institute of Technology Madras (IIT Madras) has partnered with Altair, a company providing solutions in simulation and high-performance computing and artificial intelligence, to start a laboratory for e-mobility. The eMobility Simulation Lab at the department of engineering design, IIT Madras, will have the latest tools along with financial support from Altair. More labs and facilities for research and training in e-mobility will be set up at the institute later. The laboratory will host Altair’s modelling and simulation tools that will support academic work IIT Madras will carry out other e-mobility labs for batteries, charging, power electronics, motors and controllers, and vehicle engineering.
‘A’ alone can complete a work in 50 days while ‘A’ and ‘B’ together can complete the same work in 20 days. How much percentage of the work, ...
‘X’ and ‘Y’ together can complete a work in 16 days, while ‘Y’ and ‘Z’ together can complete the work in 10 days. If ‘Y’ takes 20 da...
P can do a piece of work in 15 days, Q can complete double the work in 60 days and R can do the work in 40 days. If all of them together earn Rs. 3000, ...
A and B can do a work in 24 days and 32 days, respectively. If A works on it for ‘x’ days and B works on it for ‘x – 1’ days, then one-third o...
A team leader can do a job as fast as three members of the team working together. If one of the members can do the job in 5 hrs, the second one takes 10...
28 typists working 5 hours per day can complete a typing job in 18 days. ____ typists working _____ hours per day can complete (5/6)th part of the work ...
A alone can do a piece work in 15 days and the time taken by A alone is 50% more than the time taken by B. They started work together alternatively star...
A, B and C alone can complete a work in 24, 48 and 32 days respectively. All of them started working together but after 2 days from start A left the job...
Ajay started a work and left working after 8 days. Vijay finished the remaining work in next 36 days. Had Ajay left the work after working for 12 days t...
A person travelled for the first 150 km at a certain speed in 6 hours. After that, the speed of the person decreased by 6 km/h. If the person took a tot...