Question
How many statements about SJVN's Gujrai Solar Power
Station is/are incorrect? 1. SJVN Limited commissioned its 50 MW Gujrai Solar Power Station in Uttar Pradesh. 2. The project was executed by SJVN through its renewable arm, SJVN Green Energy Limited (SGEL). 3. The estimated cumulative energy generation over 25 years is 2,477 million units.Solution
• SJVN Limited, a Mini Ratna, Category-I and Schedule ‘A’ Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station in Kanpur Dehat, Uttar Pradesh. • With this milestone, the total installed power capacity of SJVN stands at 2,277 MW, with ten power stations currently operational. • The 50 MW Gujrai Solar Power Station has been executed by SJVN through its renewable arm, SJVN Green Energy Limited (SGEL) at a cost of Rs. 281 crores. • The project will generate 107 million units in the first year and the cumulative energy generation over a period of 25 years is estimated to be 2,477 million units. Learn Along: About Uttar Pradesh Chief minister: Yogi Adityanath Governor: Anandiben Patel Capital: Lucknow
Anu is four times as good as Binni in completing a task. Together they finish the same task in 7 hours. In how many hours will Anu alone complete the task?
Hema takes a total of 9 hours 55 min to walk a certain distance and then cycling back to the same place from where she had started. She could walk both ...
A contractor assigned a job to three persons A, B and C. ‘A’ which is 25% less efficient than ‘B’ can complete 20% of a work in 8 days. ‘C’ ...
A and B alone can complete a work in 30 and 60 days, respectively. 50% of the work is completed by C in 6x days, and the remaining work is completed by ...
The total age of 'R' and 'D' eight years ago was thirty-six. Four years separate 'R' and 'D' in age. Determine the sum of total age (in years) between '...
What is the angle traced by the hour hand in 23 minutes?
A mobile plan costs Rs.32 for 6 minutes. What is the approximate cost, rupees, for 4 minutes?
A and B can complete a work in 40 and 60 days respectively. They started a work which is to be completed in 20 days. But it was found that they are lagg...
P, Q and R can complete a work in 10 days. 20 days and 30 days, respectively, working alone. How soon can the work be completed if P is assisted by Q an...
A flight has to travel between 2 cities A and B, 2000 km apart. The flight was slowed down due to bad weather. Its average speed for the trip reduced by...