Question
Which of the following statements is/are incorrect
regarding the ADB’s solar power plant project in Gujarat? 1. The project will use bifacial photovoltaic power modules from China. 2. It is expected to reduce 662,441 tonnes of carbon dioxide emissions annually. 3. The ADB granted a Rs 1,460 crore loan to the ENGIE group for this project.Solution
The project will use bifacial photovoltaic power modules from the United States, not China.
The average salary of A, B and C is Rs. 22000 while average salary of B, C and D is Rs. 25000. If the average salary of D be 2 times of that of ...
Read the directions carefully and answer the following question.
If in the number ‘ 9887532691 ’, the even digits are shifted to the next d...
How many numbers are there between 99 and 1000 such that the digit 8 occupies the units place?
If the numbers 1 and 2 are interchanged, 3 and 4 change places and also the symbols × and ÷, then find the value of 1 + 3 × 2 ÷ 4.
...The second number in the given number pairs is obtained by performing certain mathematical operation(s) on the first number. The same operation(s) is/a...
Select the letter from among the given options that can replace the question mark (?) in the following series.
P, N, J, H, ?
Select the option that is related to the fourth number in the same way as the first number is related to the second number and the fifth number is relat...
If 3792 = 39 and 7242 = 22, then 2958 = ?
If the positions of the second and the third digit of each of the numbers are interchanged, how many odd numbers will be formed?
