Which of the following is a key feature of the Kavach 4.0 system that Indian Railways plans to roll out?
Kavach 4.0, an updated automated train protection system by Indian Railways, is set to begin its roll-out in October. The initial deployment will focus on upgrading 10,000 locomotives and covering over 9,000 route kilometers, particularly on the Delhi-Howrah and Delhi-Mumbai routes. The roll-out will prioritize sections with automatic signaling, and the coverage will eventually extend to other key routes, such as Delhi-Chennai and Mumbai-Chennai. The system aims to enhance safety and efficiency in train operations but does not include the ability to operate without onboard staff or involve drones, nor does it drastically reduce installation costs to ₹10 lakh per locomotive.
Which of the following state has the highest length of national highway?
Which one of the following pairs is incorrectly matched?
Consider the following statements regarding Saksham Anganwadi and the Poshan 2.0 initiative: Which of the following statements is/are not correct?
...A train running with a speed of 153 km/hr can cross a pole in 13 seconds and a platform in 17 seconds. Find the length of the platform.
Which one of the following is not a language translator?
Which state or union territory received the GI tag for Basholi painting?
Consider the following statements about the Constituent Assembly:
1. The first demand from Indian National Congress for the Constituent Assembly ...
Which of the following events happened first according to their chronological order?
Ratio of speed of boat in downstream and speed of stream is 4:3, if speed of current is 6 km/hr, then find distance travelled (in km) upstream in 7 hours.
Which of the following order is given to the plantes of solar system on the basis of their sizes?