Get Started with ixamBee
Start learning 50% faster. Sign in now
The Shirawta Project in Pune will have a capacity of 1,800 MW, which is the highest among the two hydro projects being developed.
(150% of 950) ÷ ? = 25
46% of 13/92 × 24/91 × 3500 =?
√ [? x 11 + (√ 1296)] = 16
4387897 – 3286871 – 51926 = ?
√10000 × √8100 - (50)² = √(?) + (80)²
280 – 70 × 14 ÷ 5 = ? – 21 of 3
?% of (√196) × 24 + 344 = 428
?% of 320 - 69 = 123
What are the values of k, if the roots of the equation x² + 2(k - 4)x + 2k = 0 are equal?