The time taken by ‘A’ to build a wall alone is 35% more than the time taken by him to build it along with ‘B’. ‘B’ will take how much percent more time to build the same wall than the time taken by him to build it along with ‘A’?
Let the work ‘A’ and ‘B’, can do in 1 day be ‘a’ units and ‘b’ units, respectively. Let they takes ‘p’ days to build the wall, together Therefore, Total work = (a + b) × p units …….. (1) According to the question, Time taken by ‘A’ to build the wall alone = 1.35p days Therefore, total work = 1.35p × a units….. (2) From equation (1) and (2), we get 20b/7 = a Therefore, total work to be done = (a + b) × p = 27bp/7 units Time taken by 'B' to build the wall = 27bp/7b = 27p/7 days Therefore, required percentage = (27p/7 – p)/p} × 100 = 285.71% more time
Total number of umbrellas sold in city C and E together is approximately how much percent more than the total number of umbrellas sold in city B?
Find the average number of females in cities B, D and E together.
If the number of laptops sold by shop F is 50% of the total number of laptops sold by shop B and the number of laptops sold by shop G is 3/4th of the t...
What is the total number of wallets sold by all stores together on Wednesday?
What was the difference between the number of Bikes received by each distributor working with Honda Company and the number of Bikes received by each...
Find the value of [(n + c)/2].
If the curved surface area and the radius of a cylinder are 880 cm2 and 14 cm, respectively, then find the volume (in cm3) of the ...
If in year 2014, 20% of students who applied for Post Graduation also applied for Graduation then the numbers of students who apply only for Graduation ...
Find the ratio of the number of students playing badminton in school B to that in school E.
What is the angle made at the centre by the sector showing the number of laptops sold by shop A?