Time taken by B to complete the work = 25 – 5 = 20 days Let the total work = 100 units Efficiency of A = 100/25 = 4 units/day Efficiency of B = 100/20 = 5 units/day Required time taken = 0.90 x 100/(4+5) = 10 days
If A and B are any two events such that P (A) + P (B) − P (A ∩ B) = P (A), then
Rohan divided a two-digit number by '7', what is the probability that the remainder obtained is a prime number?
A box contains 8 yellow marbles, ‘x’ blue marbles and 12 white marbles. A box contains 5 yellow marbles, 2 blue marbles and 3 white marbles. The pro...
There are 14 boys and 6 girls giving interview for a job. If three of them are selected, then what is the probability that one of the three is a girl an...
A coin is tossed 9 times. Find the probability of almost 2 tails.
Given that E and F are events such that P(E) = 0.8, P(F) = 0.4 and P(E∩ F) = 0.2. Find P(F|E).
In a box, there are three different colour cubes: blue, green, and orange. The sum of the number of green and blue cubes in the box equals the number of...
A card is chosen at random from a standard deck of 52 playing cards, without replacing it, a second card is chosen. What is the probability that first c...
A box contains 21 ribbons out of which [A] ribbons are white, and rest is green in colour. The probability of drawing a white ribbon and a green ribbon ...
A bag contains 5 green gems and 7 orange gems. If 2 balls are drawn random, then what is the probability that at least 1 gem is orange.