Start learning 50% faster. Sign in now
The Green Energy Corridor Project aims at synchronizing electricity produced from renewable sources, such as solar and wind, with conventional power stations in the grid. For evacuation of large-scale renewable energy, Intra State Transmission System (InSTS) project was sanctioned by the Ministry in 2015-16. It is being implemented by eight renewable-rich states of Tamil Nadu, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Gujarat, Himachal Pradesh, and Madhya Pradesh. The project is being implemented in these states by the respective State Transmission Utilities (STUs).
Temperature of the Sun is measured by
In the atmosphere ultraviolet rays are absorbed by –
UNO was established on?
The splitting up of white light into seven colours on passing through a glass prism is called as
What is the frequency of Ultrasonic Waves?
How much calorie of energy is released by a boiled egg?
The method of transfer of heat in liquid is
Which statement about the properties of light and sound is incorrect?
Assess the accuracy of these statements concerning entropy and thermodynamic equilibrium:
(I) Entropy measures the disorder or randomness within ...
What device is primarily used to convert alternating current (AC) into direct current (DC)?