Start learning 50% faster. Sign in now
The Green Energy Corridor Project aims at synchronizing electricity produced from renewable sources, such as solar and wind, with conventional power stations in the grid. For evacuation of large-scale renewable energy, Intra State Transmission System (InSTS) project was sanctioned by the Ministry in 2015-16. It is being implemented by eight renewable-rich states of Tamil Nadu, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Gujarat, Himachal Pradesh, and Madhya Pradesh. The project is being implemented in these states by the respective State Transmission Utilities (STUs).
Marginal physical product (MPP) where P=production, and X=input, is equal to
Primary tillage is completely avoided and secondary tillage is restricted to seedbed preparation in the row zone only. This is done in which type of til...
What type of chromosomal disorder is Edwards syndrome?
Small etiolated area develops near the distal end of the fruit which gradually spreads, turns nearly black and covers the tip of the fruit completely. T...
Which of the following is NOT true about the National Cooperative Development Corporation?
Which of the following hormone deficiency causes dwarfism in plant?
Nucleic acids are:
Which trade barrier can impact the international marketing of sustainable agricultural products?
Indian grassland and fodder Research Institute is located at
What is the probable impact on supply when a technological breakthrough significantly reduces the time required to produce a certain product?