What was the primary technology used in the advanced water level monitoring system introduced by Northeast Frontier Railway?
The advanced water level monitoring system introduced on the Brahmaputra Mail Express by Northeast Frontier Railway uses LoRa and GPRS-based communication for accurate and continuous monitoring of water levels in the train's tanks.
Which step would be the following output?
Tall 50 person 42 hope 32 equal 26 centre 22 75 wave
In which step are the elements “today 91 done 20“ found in the same order?
What is the smallest number in the penultimate step of the given input?
Which number would be at the fourth position from the left end in the last step of the output?
How many steps are required to rearrange the given input?
In step I, which of the following word would be at 7th position from the left?
Which of the following steps will be the last but one of the above input?
What is the sum of the third element from the left in step II and second from the right in the last step?
In step II of the rearrangement, if 'practical' is related to 'wrong and 'weeping' in a certain way. Which of the followings would 'theoretical' be rel...
What is the position of “20” from the right end in the last step?