Start learning 50% faster. Sign in now
Indian Renewable Energy Development Agency Ltd. (IREDA) and Punjab National Bank (PNB) have signed a Memorandum of Understanding (MoU) aimed at advancing renewable energy initiatives across the nation. The agreement, signed at IREDA's registered office in New Delhi on February 19, 2024, paves the way for joint efforts in co-lending and loan syndication for a diverse spectrum of renewable energy projects.
Satellites used for telecommunication relay are kept in a geostationary orbit. A satellite is said to be in such an orbit when:
1. The orbit is g...
In which year was the second National Labour Commission constituted under the chairmanship of "Ravindra Varma"?
GoI to Launch New Coin of Rs. ______ to Mark New Parliament Inauguration.
Which state become the first Indian state to roll out Universal Basic Income?
From the information given below, calculate the sum insurable :
Date of fire-01.03.2016
Turnover from 01.03.2015 to 29.02.2016 - ₹ 88...
A cost incurred in the past and that cannot be recovered in the future is called ________.
Two wires A and B are made of the same material and have the same length but different cross-sectional areas. If the resistance of wire A is 16 times th...
Which of the following provision require special majority of the Parliament along with the ratification of states for their amendment:
1. Citiz...
A magnesium ribbon burns with a dazzling flame in air (oxygen) and changes into a white substance 'X'. The X is:
Find the average of first 10 whole numbers.