Start learning 50% faster. Sign in now
Rishikesh-Karnprayag Rail Project: The new broad gauge (1676 mm) rail line between Rishikesh and Karnaprayag is a very important development project in the state of Uttarakhand. The proposed railway line will connect 5 important cities like Devprayag, Srinagar, Gauchar and Karnaprayag. The length of this project with a project cost of Rs 16216 crore is 125.20 km, in which 104 km of railway line will be underground. 18 bridges and 17 tunnels are to be constructed under the project. The construction work of bridges and tunnels is being done at a fast pace.
The major maize producing districts in Rajasthan are -
Which earthquake measuring scale is based on Earth's rigidity and the amount and area of slip on the fault?
Which of the following is not correctly matched?
Norman Borlaug was given Nobel Prize in which field?
Which of the following pairs of State and formation year is/are correct?
I. Nagaland - 1972
II. Uttarakhand - 2000
III. Arunachal Pradesh - 1987
A. his subjects wisely
B. was a very kind and generous
C. king who looked after
D. everyone said that he
Where has the Constitution Park been inaugurated in Rajasthan by President Draupadi Murmu?
Which blood cells are called 'Soldiers' of the body?
What is the range of the intensity scale used in measuring earthquakes?