Question
Rishikesh Karanprayag rail line was in discussion
recently, what will be the total length of this rail line?Solution
Rishikesh-Karnprayag Rail Project: The new broad gauge (1676 mm) rail line between Rishikesh and Karnaprayag is a very important development project in the state of Uttarakhand. The proposed railway line will connect 5 important cities like Devprayag, Srinagar, Gauchar and Karnaprayag. The length of this project with a project cost of Rs 16216 crore is 125.20 km, in which 104 km of railway line will be underground. 18 bridges and 17 tunnels are to be constructed under the project. The construction work of bridges and tunnels is being done at a fast pace.
Which of the following statements is/are correct in regards to the Particularly Vulnerable Tribal Groups (PVTGs)?
1.In 1973, the Dhebar Commissio...
Which of the following is not an unfair labour practice under the Industrial Disputes Act, of 1947?Â
According to industrial relation code 2020 ,Which of the following industrial establishments are required to prepare standing orders?
With reference to the Resource building and mobilization of the IMF, which of the following statements is/are correct?
       I.    �...
Simplify the following expression.
{(p² - 2p – 63)/(p² + 14p + 49)}
Which of the following statements is incorrect regarding the Indian Councils Act, 1861:
A cube has six faces, each of a different colour. The red face is opposite to black. The green face is between red and black. The blue face is adjacent ...
Consider the following statements regarding National Child Labour Project Scheme (NCLP Scheme):Â
1. NCLPS is a Secondary sector scheme where fun...
The sugar present in fruits is :
The major and top source of oxygen in the atmosphere is