Question
How many kilometers of transmission lines are planned to
be added by 2031-32 under India's National Electricity Plan?Solution
A total of 191,000 circuit kilometers (ckm) of transmission lines are planned to be added by 2031-32 under the National Electricity Plan.
This greenhouse type is characterized by two roof slopes of equal pitch and width, suitable for small-sized structures?
Which of the following statement is not correct about the facilitated diffusion?Â
In the context of extension communication, what does “feedback” mean?
Which principle suggests that extension professionals must respect clients’ cultural values to ensure success?
Which structure is a unique feature associated specifically with the Hymenoptera order and aids in wing coupling during flight?
Saline soil having
(A) pH<8.5
(B) E.C.>4
(C) ESP<15
(D) Physical condition - Flocculated
Choose the correct answer from the options given below:
Under DAY NRLM, what is the limit of collateral free loan for SHGs?Â
Jute prefer to grow in
___and aspartate are the primary carboxylation product of Câ‚„ cycle.
Which state ranks first among all the Indian states in terms of Angiosperm diversity?