The star schema is a popular schema design used in data warehousing because it simplifies complex queries and enhances performance, especially for Online Analytical Processing (OLAP). In a star schema, a central fact table (storing metrics) is surrounded by dimension tables (storing descriptive attributes). The structure is simpler compared to more complex schema designs like snowflake schemas, and the reduced number of joins leads to faster query performance, which is crucial for OLAP systems. This schema enables easy data retrieval because the dimension tables are denormalized, meaning there are fewer joins and faster processing of aggregations and filtering. This efficiency is critical when performing data analysis, as OLAP queries often involve large volumes of data and need to be optimized for speed. The star schema also helps in creating intuitive and easy-to-understand data models for end-users. Why Other Options Are Incorrect:
Aman, Arun and Abraham can complete a work in 12, 20 and 24 days respectively. They all start working together. Aman left the work 1 day before its comp...
Neha can do a work in 45 days while Meha can do the same in 90 days. If Neha works for 'q' days while Meha works for 'q + 2' days then one-sixth of the ...
A alone can complete 50% of a work in 20 days while B takes 16 days more than A to complete it. If B and C together can complete the work in 24 days, th...
There are three taps of diameter 2 cm, 3 cm, and 4 cm, respectively. The ratio of the water flowing through them is equal to the ratio of the square of ...
6 men can complete the same work in 12 days, 8 women can do it in 18 days and 18 children can complete it in 10 days. 4 men, 12 women, and 20 children t...
1 man and 4 women can complete a work in 65 /4 days, while 3 men and 4 women can complete it in 13 /2 days. In whom many days will be 13 women complete ...
A2 type ‘P’ pipes can fill a tank in 450 hours, while B2 type ‘Q’ pipes can fill the same tank in 6...
Billy, Tony and Mike were three workers, employed by a Contractor. They completed the whole work in 20 days. Initially all of them worked together, but ...
A, B and C can complete a work in 10, 20 and 15 days respectively. A left the work 3 days before the work was completed and B left 1 days after A had le...
Three machines P,Q and R were hired by a company for a month. Machine P runs 18 hours for 15 days, machine Q runs 20 hours for 18 days and machine R run...