Question
Which of the following types of testing is primarily
focused on validating the functionality of a system without considering the internal structure of the application?ÂSolution
Black Box Testing is a software testing method where the tester focuses on verifying the application’s functionality against the specified requirements without examining the internal code structure or logic. This method tests the system's input-output behavior, ensuring that, given certain inputs, the expected outputs are produced. Black Box Testing is beneficial for assessing user experience, functionality, and usability, making it especially suitable for higher-level testing, such as System Testing and User Acceptance Testing (UAT). It allows testers to identify discrepancies between actual and expected outcomes, validating whether the system operates as intended from an end-user perspective, regardless of how the internal processes achieve these outcomes. Option A (White Box Testing) - White Box Testing requires knowledge of the internal structure and involves testing the logic and code paths directly, unlike Black Box Testing. Option B (Unit Testing) - Unit Testing, though it focuses on individual components, typically involves examining code and logic internally, aligning more with White Box Testing practices. Option D (Integration Testing) - Integration Testing checks the interaction between components or systems and may involve both internal and external perspectives, but it is not limited solely to the input-output relationship. Option E (Regression Testing) - Regression Testing ensures new code changes do not adversely affect existing functionality, often involving various types of testing, including both Black Box and White Box approaches.
A and B together can complete a work in 12 days, and B alone can complete it in 20 days. How many days will A take to complete the work alone?
A can complete a piece of work in 10 days. B in 15 days and C in 20 days. A and C worked together for two days and then A was replaced by B. In how many...
Machine X is 100% more efficient than Machine Y, and Machine Y is 75% more efficient than Machine Z. Machines X and Z, working together, can complete a ...
A man takes 200 days to finish a work alone. If he started working alone and joined by one more man having same efficiency as of him every day from 2nd ...
‘X’ and ‘Y’ together can complete a work in 16 days, while ‘Y’ and ‘Z’ together can complete the work in 10 days. If ‘Y’ takes 20 da...
A pipe can fill a tank in 14 hours, and B pipe can drain a tank in 21 hours. If a system of N pipes (fill pipes and drain pipes put together) can...
20 men or 40 women can complete a piece of work in 24 days. A man and a woman together complete the work and receive a total wage of Rs. 12,000. Find th...
Sushil can type 40 lines in 20 minutes but he leaves 8% margin on each line. In how much time he will type 46 pages with 80 lines on each page in which...
A and B are capable of completing a project individually in 40 days and 50 days, respectively. Initially, A and B collaborated on the project, and after...
4 girls can do work in 8 days, 3 boys can do the same work in 9 days, 7 men in 2 days, and 5 women in 4 days. Who is the least efficient?