The efficiency of A,B,C,D are in the ratio of 6:5:4:3. If A and C can do a work together in 6 days. Then How many days B and D will take to complete the same work?
Let A can do 6 units per day then C can do 4 units per day So days taken by (A+C) together to complete the work = 6 days So total work = (6+4)*6 = 60 units Efficiency of (B+D) = (5+3) = 8 So B & D will do this job in = 60/8 = 7.5 days
Photo periodically, wheat is a _____ plant.
Fat and SNF % in toned milk is -
The deficiency of Mangnese causes a disease in poultry which is known as
The system of arrangement in which the distribution of feed and fodder to the animals can be done simultaneously on the both sides of feed mangers.
The average dry matter requirement of desi cow is ____ during dry period and ____ during lactating period.
National Dairy Research Institute is located at
Which of the following is not a breed of cattle?
Grass tetany in cattle and sheep is due to deficiency of
Out of these, which is not a buffalo breed ?
Two bones can be connected with each other by a type of connective tissue called___