Let the capacity of the tank be 80 litres {LCM (16 and 20)} Efficiency of pipe ‘A’ = 80 ÷ 16 = 5 litres/hour Efficiency of leak ‘A’ = 80 ÷ 20 = 4 litres/hour Combined efficiency of pipe ‘A’ and leak ‘A’ = 5 – 4 = 1 litre/hour Combined efficiency of pipe ‘A’, ‘B’ and leak ‘A’ = 80 ÷ 8 = 10 units/hour Efficiency of pipe ‘B’ = 10 – 1 = 9 units/hour Time taken by pipe ‘B’ and leak ‘A’ to fill the tank = 80 ÷ (9 – 4) = 16 hours
A and B individually can complete the work in 32 days and 48 days respectively. If the time taken by C alone to complete the work is 1.25 times the time...
A man, a woman and a boy can do a work in 4, 8, 32 days respectively. How many boysare required with 1 man and 1 woman to complete the same work in 1/4 ...
8 children and 6 women together can complete a piece of work in 10 days and work done by a children in one day is one-third of the work done by a women ...
Veer can complete a work in X days and Ayush is 40% more efficient than Veer. If both complete 4/7th of work together and get Rs. 1200 for it...
A and B together can complete a piece of work in 40 days while B and C together can complete the same work in 36 days. All of three togeth...
Peter and Rachel can complete a project together in 20 days. Peter takes four times as long as Rachel to complete the same project alone. Find the time ...
P’s 5 days work is equal to Q’s 6 days work. If P and Q together can complete the work in 25 days then how much time Q will take to complete 80% of ...
X can do a piece of work in 25 days. He worked at it for 10 days and then Y finished it in 24 days. In how many days can X and Y together finish the wor...
Virat can do a piece of work in 28 days and Sachin can do the same work in 42 days. If Virat works for 4 days and got Rs. 1800, and the remaining work w...
A and B together, B and C together and A and C together can complete a piece of work in 18 days, 15 days and 10 days respectively. Find the ratio...