Question
14 women working 8 hours a day
can complete a piece of work in 30 days. What is the time taken by 28 men working 5 hours a day to complete the work if the efficiency of a woman is 30% less than that of a man?Solution
ATQ,
Let the efficiency of a man be '5a' units/day. So, the efficiency of a woman = 0.70 × 5 = '3.5a' units/day. Total work = 14 × 3.5a × 8 × 30 = '11760a' units. So, time taken by 28 men working 5 hours a day to complete the work: = 11760a ÷ (28 × 5a × 5) = 16.8 days.
In a certain code language, 'FRONT' is coded as '21593' and 'OFTEN' is coded as "52739'. What is the code for 'E' in the given code language?
Select the option that represents the correct order of the given words as they would appear in an English dictionary.
1. Variance
2. Viole...
The sequence of folding a piece of paper and the manner in which the folded paper is cut is shown in the following figures. How would this paper look wh...
Which figure should replace the question mark (?) if the following series were to be continued?
In a certain code language, ‘BAKE’ is coded as ‘2496’ and ‘CAKE’ is coded as ‘4369’. How is ‘B’ coded in that language?Â
...Which two signs should be interchanged to make the given equation correct?
8 + 6 × 4 ÷ 2 – 10 = 6
Shown below are two different positions of the same dice, whose six faces are marked with numbers from 1 to 6. Select the number which will be on the fa...
If '+' means '×', '×' means '–', '–' means '÷' and '÷' means '+', then what will come in place of the (?) in the following equation?
9 + ...
Which two signs should be interchanged to make the given equation correct?
32 + 14 × 3 – 91 ÷ 7 = 3
What is the code for ‘many?