Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in now28 men and 21 women can complete the work in 16 days. ∴ Work done by them in 12 days = 12/16 = 3/4 Remaining 1-3/4 = ¼ work is completed by 28 men in 8 days. => Time taken by only 28 men to complete the whole work = 4 x 8 = 32 days. Work done by 21 women in a day = 1/16 – 1/32 = 1/32 ∴ Time taken by 21 women to complete the work = 32 days
The Baudouin test checks adulteration in:
secondary metabolite are produced during --------- of bacterial growth
Which is the synonym of Vitamin D3?
According to the FDA Food Code 2022, what is the recommended guideline for hand-washing sinks in food establishments?
Tetra pack uses
Lye peeling is done at a temperature of:
Moulds can thrive best in closed, damp & dark situations. Which of the following conditions suits decent for the growth of moulds?
a. ...
Match the Enzymes in Group-1 with their specific Industrial application Group-2
Mina learns how different minerals and vitamins are affected when exposed to certain conditions. Which one of them did she NOT comprehend properly?
To avoide rancidity in chips, which of the following method is used
a) Use of antioxidants
b) Use of ascorbic acid
<...