Continue with your mobile number
Let the speed of the boat in still water = 40 km/hr And the speed of the current = 3 km/hr Time = 3 hours 8 minutes = 25/8 hrs Downstream speed = 40 + 3 = 43 km/hr Upstream speed = 40 – 3 = 37 km/hr Distance = Downstream speed × Downstream time Distance = [43 × (25/8)] km Upstream time = Distance / Upstream speed Upstream time = [43 × (25/8)]/37 = 3(2/3) hrs
P can do a piece of work in 10 days. Q can do it in 16 days. With the help of R, they finish the work in 4 days. In how many days can R alone do the who...
A and B can complete a job together in 30 days; B and C can complete the same job together in 25 days, while C and A can complete the same job together ...
Three men A, B, and C working together dig 648 m deep in six days. C digs as many meters more than B. B digs as many meters more than A. Then how much d...
A alone can complete 40% of a work in 18 days while B takes 15 days more than A to complete it. If B and C together can complete the work in 20 days, th...
'x' men can complete a work in 60 days. If there had been 20 more men, the work would have been completed in 30 days. Find the value of 'x'.
A and B can complete a work together in 20 days. If A alone can complete one-fourth of the work in ‘x’ days and remaining work is completed ...
A and B individually can complete the work in 20 days and 30 days respectively. If the time taken by C alone to complete the work is 1.25 times the time...
Three Typists Axe, Wye and Zed working together 3 hours per day and can type 720 pages in 12 days. In a day Wye types as many pages more than Axe as Zed...
'A' and 'B' together can do some work in 15 days. 'A' however is 30% more efficient than 'B'. If 'A' and 'B' started the work alone but 'A' left after w...
A and B can complete a piece of work in 12 days and 15 days respectively. They start working together, but after 4 days, A leaves. In how many more days...