Start learning 50% faster. Sign in now
Quantity of milk in the initial mixture = 180 × 0.36 = 64.8 litres Quantity of water in the initial mixture = 180 – 64.8 = 115.2 litres Quantity of water is unchanged in the final mixture. So, Quantity of final mixture = (76.8/60) × 100 = 192 litres Quantity of milk in final mixture = 192 – 115.2 = 76.8 litres Value of ‘x’ = 76.8 – 64.8 = 12
40 men can complete a piece of work in 40 days. ‘x’ men started the work and after 30 days 64 more men joined them so that whole work was finished i...
A pipe can fill a tank in 14 hours, and B pipe can drain a tank in 21 hours. If a system of N pipes (fill pipes and drain pipes put together) can...
Anmol can do a piece of work in 30 days, Bineet can complete double the work in 90 days and Chintu can do the work in 60 days. If all of them jointly ge...
A and B together can do a work in 5 days. If A can alone do the same work in 15 days, then in how many days B alone will do the same work?
Pipes ‘A’ and ‘B’ can fill a tank in 9 hours and 12 hours, respectively. If pipe ‘C’ is opened along with pipes ‘A’ and ‘B’, then th...
Anil and Ashish receive Rs.2000 for work of 10 days. If Anil is 4 times efficient than Ashish, then find the daily wage received by Ashish.
48 men can complete 3/5 part of a work in 8 days working 9 hours a day. How many women can complete rest of the work if they work for 6 hours a day for ...
‘A’ and ‘B’ can do a piece of work in 30 days and 40 days, respectively. They started working together but ‘A’ left after 9 days. Find the t...
A, B, and C together can complete a task in 8 days. A alone can do it in 24 days, and B alone can do it in 18 days. How long will it take C alone to fin...
‘A’ alone can complete a work in 40 days while ‘A’ and ‘B’ together can complete the same work in 30 days. How much ...