ATQ, Total employees = 1000 Let the number of engineers and administrators be 4x and x, respectively. Equation: 4x + x = 1000 Solve for x: 5x = 1000, x = 200 Number of engineers = 800, Number of administrators = 200 Number in project = 15% of 800 + 20% of 200 = 120 + 40 = 160 Remaining staff = 1000 - 160 = 840 Number on leave = 25% of 840 = 210
What is the main ore of aluminum?
How many planets are terrestrial planets?
Diamond is harder than graphite because of which of the following reason?
Which of the following acid is found both in tomato and wood sorrel?
What is the common name of sodium carbonate?
Chlorophyll-a is present in all photosynthetic organisms except
What happens to the boiling point of water at higher altitudes?
What is the nature of the pH of milk?
If water smells bad, then that odor can be removed by adding:
A bullet is fired from a rifle which recoils after firing. The ratio of kinetic energy of the rifle to that of the bullet is –