Start learning 50% faster. Sign in now
Let the total work be 1 unit. A’s efficiency = 1/12, B’s efficiency = 1/18, and C’s efficiency = 1/36. Let them work together for x days. Work done in x days = (1/12 + 1/18 + 1/36) × x = (12/72) × x = x/6. Remaining work = 1 - x/6 = 5x/6 B and C finish the remaining work in 3 days: Remaining work = (1/18 + 1/24) × 3 = (7 × 3)/72 = 21/72 Now, 1 - 5x/6 = 21/72. 5x/6 = 1 - 21/72 = 51/72 = 17/24 x = 17/20 = 0.85 days. Final Answer: (b) 0.85 days
Let A, B, and C be the mid-points of sides PQ, and QR PR, respectively, of ΔPQR. If the area of ΔPQR is 64cm², then find the area of ΔABC.
...In ∆ABC, AB = 5cm, BC = 6cm and AC = 10cm then find out the value of cos A?
In ∆ABC, AB = 5cm, BC = 10cm, and AC = 13cm then find out the value of cos A.
The lengths of three medians in a triangles are 6 cm, 8 cm, 10 cm. What is the area of that traingle (in cm 2 )?
Find the area of triangle having sides 3m, 4m, and 5m.
Find the area of triangle having sides in the ratio 3:5:7 & the perimeter of the triangle is 60 cm
In the given figure, ADEF is a rectangle. ∠CBE = 70°, find the value of X.
In a circle, the chord AB is 12 cm, and the perpendicular from the center O to the chord AB bisects it at point P. If OP = 5 cm, what is the radius of t...