Start learning 50% faster. Sign in now
Let the total work be 1 unit. A’s efficiency = 1/12, B’s efficiency = 1/18, and C’s efficiency = 1/36. Let them work together for x days. Work done in x days = (1/12 + 1/18 + 1/36) × x = (12/72) × x = x/6. Remaining work = 1 - x/6 = 5x/6 B and C finish the remaining work in 3 days: Remaining work = (1/18 + 1/24) × 3 = (7 × 3)/72 = 21/72 Now, 1 - 5x/6 = 21/72. 5x/6 = 1 - 21/72 = 51/72 = 17/24 x = 17/20 = 0.85 days. Final Answer: (b) 0.85 days
Two cars A and B are running at velocities of 60km per hour and 45 km per hour. What is the relative velocity of car A with respect to car B, if both ar...
Cryogenics is a branch of Physics that deals with what?
The direction of magnetic field inside a magnet is
In circular motion the direction of velocity changes at _______ points.
Which of the following pairs of phenomena illustrate the particle nature of the electromagnetic radiation?
A galvanometer coil has a resistance of 14 Ω and the metre shows full scale deflection for a current of 4 mA. How will you convert the metre into a vo...
The order of wavelengths for ordinary light is:
The colour of sky appears blue due to –
Which of the following particles in motion, having the same kinetic energy, has the shortest wavelength?
In an experimental arrangement of a Fresnel's biprism, monochromatic light of wavelength 2. is used to produce interference fringe pattern. On introduc...