Work done by A, B, and C together in 1 day = (1/30) + (1/24) + (1/20). LCM of 30, 24, and 20 is 120. Work done by A, B, and C in 1 day = (4 + 5 + 6)/120 = 15/120 = 1/8 of the total work. In 5 days, they complete 5/8 of the work. Remaining work = 1 − 5/8 = 3/8. A's rate of work = 1/30. Time taken by A to complete the remaining 3/8 of the work = (3/8) × 30 = 11.25 days. Ans. a
The part of plant on which grafting is done is called
In plant tissue culture, haploid plantlets can be obtained from
Atlas 66 is a biofortified hybrid wheat variety which has been used as a donor for improving cultivated wheat and is rich in
What is the initiative introduced in 2023 that focuses on reducing fertilizer consumption and creating awareness?
Some plants fulfil their nitrogen requirement by catching and digesting flies and other insects. Such plants are categorized as:
Bottom heat technique of mango cutting for rooting is done at
Displacement of upper layer of soil from one place to another and is a form of soil degradation is called
Which of the following states was the largest producer of cotton in 2023-24?
India ranks ______ globally in milk production as per the latest data in BAHS 2024?
Which of the following combination of elements have antagonistic interaction ?