Question
A train takes 30 minutes to travel 20 km, but due to
maintenance, its speed is reduced by 25% for the next 10 km. Find the total time taken by the train to cover 30 km.Solution
Speed = 20/0.5 = 40 km/h New speed = 40 × 0.75 = 30 km/h Time = 10/30 = 1/3 hour = 20 minutes Total time = 30 + 20 = 50 minutes Answer: b) 50 minutes
Tree banding is done in mango trees to control ______ insect pest.
It is also known as Chinese layering, Pot layering, Marcottage or Gootee-
‘My Plate for the Day’ which promotes health, prevents hidden hunger and protects from diseases was developed in the year?
Which organelle is responsible for the synthesis of glycoproteins and glycolipids
The theory of extension education is based on
The breeding method useful in purification of existing varieties is
Blind hoeing is recommended for –
Soil structure classification based on general shapes and arrangement of peds are called
Trading of livestock products like milk powder, egg powder, meat, wool, leather etc. constitute
If a manufacturing company does not adhere to CGMP regulations :