Start learning 50% faster. Sign in now
15 men× 30 days = 450 Women’s 1-day work = 450/(30× 20) = ¾ work (8 Men + 12 Women)’s 1-day work = 8 +12× ¾ = 17 Days taken by 8 M and 12 women to finish the work = 450/17 days Alternate Method: 15 Men can do this job in 30 days and 30 women can do this job in 20 days It means 45 men or 60 woemn can do this job in = 10 days So 8 Men and 12 women can do this job in = 10/{8/45 + 12/60} = 10/ {8/45+ 1/5} = 10 /{17/45} = 450 /17
In a typical instruction pipeline, which stage is responsible for fetching the next instruction from memory?
Index of first element of linked list default value?
What is the role of a device driver in an operating system?
What is the term for the minimum voltage required to turn on a transistor?
Which one of the following statements is FALSE?
Which data visualization technique is best suited for displaying hierarchical data with a tree-like structure?
What is the maximum number of unique IP addresses that can be assigned in IPv4?
What is a default route in routing?
Write through technique is used in which memory for data updating
___ mapping is used in cache organization which is the quickest and most supple organization.