Question
A and B together can do a work in 10 days, B and C can
do together in 5 days while C and A together can do in 12 days. In how many days C alone will complete the work?Solution
(A + B)’s 1 day’s work = 1/10 (B + C)’s 1 day’s work = 1/5 (C + A)’s 1 day’s work = 1/12 2 (A +B + C)’s 1 day’s work = 1/10 + 1/5 + 1/12 = (6+12+5)/60 = 23/60 ∴ (A + B + C)’s 1 day’s work = 23/120 Now, C’s 1 day’s work = (A + B + C)’s 1 day’s work – (A + B)’s 1 day’s work, => 23/120 – 1/10 = 11/120 Therefore C will finish the work in = 120/11 =
days.
State true or false
A ping of death attack involves sending a malformed packet to a targeted machine, resulting in deleterious behavior such ...
In pandas, what does df.groupby('A').agg({'B': 'sum', 'C': 'mean'}) return?
Which of these is a distributional representation for words?
Which is best fit for blank space 16?
What is the primary purpose of the fork() system call in Unix-based operating systems?
The ability of the device to give identical output when repeat measurement are made with the same input is defined as________
Which of the following statements best describes a mesh topology in network design?
In a nodal analysis a circuit with 10 nodes will have _______ unknown voltage and _______equation.Â
Which of these is an application of AI in healthcare?
Which of the following conditions is not one of the four necessary conditions for a deadlock to occur?