Start learning 50% faster. Sign in now
Assume total work = LCM (20, 30) = 60 If the entire work is 60 units, Virat can complete 3 unit per day, and Sachin can complete 2 unit per days In 4 days, Virat completes 12 units and got Rs.2400 i.e. Rs.200 per unit. Remaining work = (60 – 12)unit = 48 unit ∴ Sachin earning = Rs.48 × 200 = Rs. 9600
1. Visitors acquainted with the history of the Brazilian city of Campinas will probably find it hard to imagine that it was once home to ancient wooden ...
If any Governor believed that he had (1)/many say in the matter of fixing a date for the Speaker’s election, (2)/it is both contrary to the constitut...
Of the four given options, choose the most appropriate one.
Pakistan’s support to the (a)/ terrorists of India (b)/ should be universally (c)/ condemned by all (d)
Each sentence given below has been divided into four Sentence A, B, C, D, one of which is erroneous. Identify the erroneous part and mark that option a...
In propounding this concept, (A)/he does not adapt (B)/a nihilistic view of the continuing (C)/use of these chemicals (D).              Â...
If you Have(1)/ come on time, (2)/we would not have (3)/lost the game .(4)
With temperatures in Europe / set to exceed 50 C, governments urged their citizens / to take the utmost precaution, warning that / in some areas the w...
Although the new policy aims (1)/ to enhance the productivity,(2)/ but there are still significant (3)/challenges that need to be addressed (4)/ No erro...