Question
‘X’ and ‘Y’ together can complete a work in 10
days, while ‘Y’ and ‘Z’ together can complete the work in 8 days. If ‘Y’ takes 12 days to complete the work alone then find the approximate time taken by all three together to complete 65% of work.Solution
Let the total work = 120 units Efficiency of (X + Y) = 120/10 = 12 units/day Efficiency of (Y + Z) = 120/8 = 15 units/day Efficiency of ‘Y’ = 120/12 = 10 units/day Efficiency of (X + Y + Z) = (12 + 15 – 10) = 17 units/day Required time taken = (0.65 × 120)/17 = 5 days (approx)
What symptom is characteristic of Verticillium Wilt in cotton?
The animals lack the capacity to regulate their body temperature are termed as …………………………..
...The old man cactus, is a species of cactus native to Hidalgo and Veracruz in central Mexico. Scientific name of old man Cactus is?
Choose the incorrect option
_____ are the compounds used to improve the nutritional value of the basal feeds so as to take care of any deficiency.
The pH in soils can be raised by adding:
Identify the scheme which consolidate the existing rural road network by upgradation of existing ‘Through Routes’ and ‘Major Rural Lin...
Kissan Credit Card system was introduced byÂ
The saline soils contain toxic concentration of soluble salts in the root zone. These saline soils are also known as…………...
Which of the following is matched correctly?