Total work = Number of days×1 day’s work (efficiency) Total work = LCM (8, 24) = 24 unit 1 day’s work of (A+B) = 24/8 = 3 unit 1 day’s work of A = 24/24 = 1 unit 1 day’s work of B = 3 - 1 = 2 unit Now, Time taken by B to completed the work = 24/2 = 12 days
In a trapezium, the lengths of the parallel sides are 18 cm and 24 cm, and the height is 12 cm. A circle is inscribed in the trapezium. Find the radius ...
In a circle with centre O, PAX and PBY are the tangents to the circle at points A and B. from an external point P. Q is any point on the circle such tha...
If in a right angle triangle ABC, Angle B is a right angle. AB = 20 cm, BC= 21 cm if BD is perpendicular to AC find the length of BD?
Line AB is 24 m in length and is tangent to the inner one of the two concentric circles at point C. Points A and B lie on the circumfere...
A triangular field has sides measuring 50 m, 78 m, and 112 m. Determine the height of the field corresponding to the longest side and also find the area...
If O is the orthocentre of ΔABC , if∠ BOC = 1050 then what is the measure of ∠ BAC?
In a circle with center O, two tangents PA and PB are drawn from point P outside the circle. If PA = 24 cm, PB = 24 cm, and OP = 30 cm, find the length ...
Triangle ABC and triangle ACD are right angled triangle and AB = x cm. BC = y cm, CD = z cm and x times; y = z and x, y and z has minimum integra...