Question
The efficiency of A, B, C, D are in the ratio of 6 : 5 :
4 : 3. If A and C can do a work together in 6 days. Then How much days B and D will take to complete the same work?Solution
Efficiency of (A+C) = (6+4) = 10 Days taken by (A+C) together to complete the work = 6 days Efficiency of (B+D) = (5+3) = 8 So, B and D will take time = (Total days of (A+C)×Total Efficiency of (A+C))/(Total Efficiency of (B+D)) = (6 ×10)/8 = 60/8 = 7(1/2) days
Which of the following statements is/are correct?
a.      Better the medium for growth for the microorganisms, more heat resistant are t...
The alcohol (Ethanol) is used for the precipitation of
Which of the following is used for checking integrity of aseptic packaging material?
a)Â Â Â Â Â Sterility test
b)Â Â Â Â Â Drop test...
Mission for Integrated Development of Horticulture (MIDH) is a
Cutting boards must be sanitized with:
A food must contain less than ___ grams of fat per serving to be considered a low-fat food:
Which of the following is a non-climacteric fruit?
Which of the following statement not true about Thermophilic Anaerobic Spoilage
The chemical released during allergic reactions is:
Probiotics are: