Continue with your mobile number
Efficiency of Ram = 100/50 = 2% Work done by Ram in 20 days = 20/50 × 100 = 40% Remaining work = 60% Efficiency of Lakshman = 60/30 = 2% Therefore, required number of days = 100/((2+2)) = 100/4 = 25 days
Immediate and ultimate source of nitrogen is
Vegetatively propagated crops are usually:
The average land holding of a marginal farmer in India is
Which one of the following is a micro-nutrients in plants?
‘Murrah’ is a popular breed of
The term to refer a shoot with a different colour flower or leaf that may arise in a group of plants is
Cut or excised leaves remain green for long if induced to root or dipped in_____
Green manure crop suitable for alkaline and water logged soil is
Which fertilizer has 2 primary essential nutrients?
A vertical marketing system is: