Question
Chacha and Bhatija can complete a work in 48 days. In
how many days Chacha alone does the 2/3rd of the total work if they start working together after 40 days Chacha left the work, work is completed in 52 days.Solution
=> 1/Chacha + 1/Bhatija = 1/48 If, Chacha leaves the work after working 40 days with Bhatija, then the whole work is completed in 52 days. Therefore, Bhatija alone works for 12 days. => 40 (1/Chacha + 1/Bhatija) + 12/Bhatija = 1 => (40 × 1/48) + 12/Bhatija = 1 => 5/6 + 12/Bhatija = 1 => 12/Bhatija = 1 – 5/6 => 12/Bhatija = 1/6 => Bhatija = 72 Then, 1/Chacha = 1/48 – 1/72 => Chacha = 144 Chacha alone can complete the whole work in 144 days. And, Chacha can do 2/3rd of the work in = (144 × 2/3) days = 96 days.
Which of the following is not a characteristic of simple harmonic motion (SHM)?
What is the total capacitance in the given circuit?
A block of mass m rests on a smooth wedge of mass M, which in turn rests on a smooth horizontal surface. The wedge is accelerated horizontally with acc...
In a nuclear reaction, two deuterium nuclei fuse to form a helium nucleus. Which of the following correctly describes the reason for energy release?
An athlete can jump farther by running before jumping due to which type of inertia?
According to Kepler’s third law of planetary motion, the square of the orbital period of a planet is proportional to the __________.
Parsec is the unit of
A transformer has 1000 turns in the primary and 100 in the secondary coil. If input voltage is 220 V, output voltage is:
A copper block of mass 3 kg is heated in a furnace to a temperature of 450°C and then placed on a large ice block. Find the maximum amount of ice that...
A machine does 600 J of work in 2 minutes. Find its power. Â