Question
A work can be completed by βAβ and βBβ, alone in
12 days and 18 days, respectively. Find the number of days taken by βCβ to complete the same work alone if βAβ, βBβ and βCβ together can complete the whole work in 4 days.Solution
Let total work = 36 units (LCM of 12 and 18) Efficiency of βAβ = (36/12) = 3 units/day Efficiency of βBβ = (36/18) = 2 units/day Combined efficiency of βAβ, βBβ and βCβ = (36/4) = 9 units/day Efficiency of βCβ = 9 β (3 + 2) = 4 units/day Required time taken = (36/4) = 9 days
A university has Y students. 40% study science, 35% study arts, and the rest study commerce. In an exam, 25% of science students, 20% of arts students, ...
The average of 20 numbers is 50. If two numbers, 40 and 60, are removed, what is the new average?
Anoop has a specific number of βΉ10 coins and βΉ5 coins. The total number of coins is 37, and the number of βΉ10 coins is 13 l...
A container has 80 liters of pure milk. 20 liters of milk is removed and replaced with 20 liters of water. Then, 20 liters of the new mixture is removed...
142.07 + 21.89 β (128.12 Γ· 7.81 β 12.09 Γ 6.98) = ?
A square pyramid has a base side of 8 cm and a height of 15 cm. Find the total surface area of the pyramid.
Calculate the difference in the interest earned by investing Rs. 18,000 and Rs. 15,000 at a simple interest rate of 16% per annum...
If a and b are whole numbers such that ab = 169, find the value of (a-3)(b+2).
In a 500-meter race, competitor 'P' runs at a speed of 18 km/h and allows a head start of 25 meters to competitor 'Q,' who eventu...