Question
‘A’ alone can do some work in 12 days. ‘B’ and
‘C’ together can do the same work in 6 days. If ‘B’ is half as efficient as ‘A’, then find the time taken by ‘C’ to complete the work alone.Solution
Let the total work be 12 units. {LCM (12 and 6)} So, efficiency of ‘A’ = (12/12) = 1 units/day So, efficiency of ‘B’ = (1/2) = 0.5 unit/day Efficiency of ‘B’ and ‘C’ together = (12/6) = 2 units/day So, efficiency of ‘C’ = 2 – 0.5 = 1.5 units/day So, time taken by ‘C’ to finish the work alone = (12/1.5) = 8 days
What symptom is characteristic of Verticillium Wilt in cotton?
The animals lack the capacity to regulate their body temperature are termed as …………………………..
...The old man cactus, is a species of cactus native to Hidalgo and Veracruz in central Mexico. Scientific name of old man Cactus is?
Choose the incorrect option
_____ are the compounds used to improve the nutritional value of the basal feeds so as to take care of any deficiency.
The pH in soils can be raised by adding:
Identify the scheme which consolidate the existing rural road network by upgradation of existing ‘Through Routes’ and ‘Major Rural Lin...
Kissan Credit Card system was introduced byÂ
The saline soils contain toxic concentration of soluble salts in the root zone. These saline soils are also known as…………...
Which of the following is matched correctly?