A can complete a work in 40 days. B takes 20 days less than A to complete the same work. In how many days can both of them together complete 90% of the work together?
Time taken by B to complete the work = 40 – 20 = 20 days Let the total work = 40 units Efficiency of A = 40/40 = 1 units/day Efficiency of B = 40/20 = 2 units/day Required time taken = 0.90 x 40/(1+2) = 12 days
Evaporative cooling system works on main principle of
Which sprayer is used suited for spraying operations in kitchen garden
The Nobel Prize in Physiology or Medicine 1948 was awarded to Paul Hermann Müller for his
discovery of which high efficiency contact poison ag...
Atlas 66 is a biofortified hybrid wheat variety which has been used as a donor for improving cultivated wheat and is rich in
Who has given scarcity definition of economics?
Self-incompatibility does not exist in which mango variety
Which is the most effective and piratical way to raise the PH of acid soil?
Which of the following is not communication process:
Viral disease transmitted by seed is
Who is the Father of Mycology and Plant Pathology in India and became the Imperial Mycologist in India