Question
Aβ and βBβ together can complete a work in 18 days
while βAβ takes 36 days to complete the same work alone. If βCβ is 50% more efficient than βBβ, then find the time taken by βCβ alone to complete the whole work.Solution
Let the total work = 36 units Efficiency of (A + B) = 36/18 = 2 units/day Efficiency of βAβ = 36/36 = 1 unit/day Therefore, efficiency of βBβ = 2 β 1 = 1 units/day Efficiency of βCβ = 1.5 Γ 1 = 1.5 units/day Required time taken = 36/1.5 = 24 days
Growing of two or more crops simultaneously intermingled without any specific row pattern is known as:
Button mushroom belongs to the genus
Disorders like Hollow Stem of Cauliflower; Browning of Cauliflower ; Top sickness of Tobacco is caused due to the deficiency of
Application developed by Indian institute of wheat and barley research for pest management in wheat crop is
Which crop is sensitive both to drought and excessive moisture condition?
Which one of the following stain is used for staining of the nematodes?
Gurgaon project was started by
Land holding of medium farmer is
Tristeza is the viral disease of citrus which is particularly transmitted by which of the following:
Which one is not related with 4-H club?