Ashish and Anil can do a piece of work in 12 days and 15 days respectively. Ashish completed 30% of the work. Find the time taken by Anil to complete the remaining work.
Let the total work be (LCM of 12 and 15) = 60 units Efficiency of Anil = 60/15 = 4 units/day Remaining work = 60 x 0.7 = 42 units Time taken by Anil to complete the remaining work = 42/4 = 10.5 days
Which technique was introduced to address the problem of resistance developing in bollworms against Bt cotton?
First dwarf variety of the world which is considered as a miracle rice?
The program used in the digitization technique of geoinformatics:
Bacteria responsible for oxidizing NO2-, NO3-in soils is __ ?
Which of the following statement is incorrect?
Light intensity at which photosynthesis and respiration are equal is known as:
Under which ministry does the Cotton Corporation of India (CCI) operate?
According to third advance estimates of crop production 2023-24, total foodgrain production in India is ____
Which of the following parameters is incorrectly matched with the measured device?
-------------------- is a generic name for an organization of producers of any produce, e.g., agricultural, non-farm products, artisan products, etc. It...