Question
Ratio of the work done by P, Q and R in one day is 6:4:7
respectively. They all together can complete the work in 45 days. Q and R worked on it for 27 days. In how many days P will complete the remaining work.Solution
Let total amount work be = 45 x 17 = 765 units Amount of work done by Q and R in 27 days = 27 x 11 = 297 units Amount of work left = 765 – 297 = 468 Required time = 468/6 = 78 days
A compound that is a white solid which absorbs water vapour from the air is
Deficiency of _________ causes the leaves to develop a dark green colouration.
What is the focal length of a double convex lens for which the radius of curvature of each surface is 30 cm and the refractive index of glass is 2.50 ?
A body of mass 2 kg is moving in SHM with angular frequency 4 rad/s and amplitude 0.1 m. Max kinetic energy is:
A person is hurt on kicking a stone due to –
Two waves, each of amplitude 1.5 mm and frequency 10 Hz, are travelling in opposite direction with a speed of 20 mm/s. The distance in mm between adjace...
Silver bromide when kept in sunlight undergoes a change in color. What is the color formed?
Which of the following devices stores electrical energy in a magnetic field?
Which among the following is produced using ‘Haber Process’?
A current-carrying conductor is placed perpendicular to a uniform magnetic field. The force on the conductor is given by: