Question
P’s 3 days work is equal to Q’s 4 days work. If P
and Q together can complete the work in 32 days then how much time Q will take to complete 75% of the work?Solution
Ratio of efficiency of P and Q = 4:3 Let the efficiency of P and Q be 4x and 3x units per day respectively. Total work = 7x × 32 = 224x units Required time = (0.75 × 224x)/3x = 56 days
Which is an insect growth regular?
Meiotic division takes place in:
Which of the following element is non-essential but useful for plants?
Which soil structure grade indicates no noticeable aggregation?
Weevils belong to family _______________.
Mulches generally minimize
Water level recording is done by
Dapog method of raising seedlings is related toÂ
Name the dual purpose breed of cattle that belongs to Maharashtra?Â
The study of soil constitutes an independent branch of science known as: