Start learning 50% faster. Sign in now
Total time taken by Vinod alone to complete the work = (28/7) x 10 = 40 days Total time taken by Sonal alone to complete the work = (12/3) x 10 = 40 days Let total work be 40 units. Hence, the Required time will be = 40/2 = 20 days
In area of hill slopes soil erosion can be controlled by-
What is called for the mature soils which are arranged in a series of zones?
Pusa hybrid 4 is a variety of:
Nutritional quality has been improved by the addition of vitamin A by genetic engineering in which plant
Farmers can prevent and slow down soil erosion by
How many person days were generated under MGNREGS in FY 2023-24?
Atlas 66 is a biofortified hybrid wheat variety which has been used as a donor for improving cultivated wheat and is rich in
The variable cost is a component of total cost, another is_________?
I. Marginal cost
II. Fixed cost
III. Average cost
James Stuart associated with ______
The third tier of Panchayat Raj is: