A certain Sales target was assigned to a team of men to complete in 18 days. But 8 men did not turn up for the target and the rest men complete the sales target in 30 days. What was the original number of men in the team?
ATQ, we can say that Let the original no. of men in the team be taken as = ‘x’ then, 18x = 30(x - 8) 12x = 240 x = 20 men
(?)2 + 4.113 = 23.92 – 28.03
(124.99)² = ?
³√? `xx` 32.87 + 59.83 `xx` 28.7665 – 48.8745 `xx` 21.642 = 1085.344
2720.03 ÷ 79.98 x 39.9 = ? + 40.32
? + 144.99 – 120.01 = 25.01 × 6.98
(108.999)² - (102.001)²=?
6940 ÷ 28 ÷ 7 = ?
`[(sqrt(750) xx15.981) -: 54.003]` `xx` ? = 6997.81001
(88.931% of 435) + (61.521% of 516) = ?
`5(17/23)` + `1(15/46)` - `5(17/25)` = ? - `6(13/23)`