Amisha is 50% more efficient than Khushi. Amisha started a work, worked for 'w' days and then Khushi replaced Amisha. khushi completed the remaining work in (w + 12) days. The ratio of the work done by Amisha and khushi is 3:4. In how many days can Amisha and Khushi together can complete the whole work?
ATQ, Let us assume that khushi alone can complete the work in 'k' days khushi one day work is (1/k) Amisha one day work is = (150/100) × (1/k) = (3/2k) w(3/2k) + (w + 12) (1/k) = 1.......(1) (3w/2k) : (w + 12)/k = 3:4...........(2) From (1) and (2) we will get w = 12, and k = 42 so Amisha can complete the work in 28 days and khushi in 42 days. (1/28) + (1/42) = (5/84) or (84/5) or 16(4/5)
Which of the following statements are correct regarding Himalayan Mountain range?
1. The Shiwalik formations are absent in Arunachal Himalayas.
Consider the following pairs:
Which of the pairs give...
Consider the following statements:
1. In an antecedent drainage pattern, the river cuts through uplifted portions of land.
2. In a superim...
Consider the following statements with reference to the features of Himalayas:
1. These mountains are tectonic in origin.
2. These are you...
Consider the following rock systems that make up the Indian landmass:
1. Aryan
2. Dravidian
3. Archean
4. Dharwar
Wha...
Consider the following rivers:
1. Vamsadhara
2. Indravati
3. Pranahita
4. Pennar
Which of the above are tributaries of Godavari?
Which of the Following Isopleth connects places of equal height above the sea level.
Consider the following statements regarding the Great Indian Desert:
1. The prevailing southwest monsoon winds tend to bypass the Thar to the eas...
What is the southern tip of India?
Which Indian state has the longest coastline?