Question
A and B can finish a piece of work in 20 days and 30
days respectively. Both work on alternate days. In how many days will the work be completed when A starts the work?Solution
Both work alternately on alternate days. A starts first. Thus, 5 units can be worked in 2 days, so time taken to work 60 units = 60/5 =12 Days.
Which of these can be overloaded?
A shift register is an example of a sequential circuit used for:
Which of the following is an example of a deadlock detection and resolution technique in DBMS?
In Generative Adversarial Networks (GANs), which component generates realistic data samples?
What is the best practice to protect sensitive data when using public Wi-Fi networks?
Which type of diode allows current to flow in only one direction?
Which hazard occurs when there is a conflict in accessing a shared resource, such as a register file or an ALU, in an instruction pipeline?
Which programming concept allows a variable name to refer to different entities based on its location in code?
In a voltage divider circuit, if the resistors are of equal value, what is the output voltage?
In which network topology does data travel in only one direction around the loop?